More on than off







Above shows the new sill welded in position and a good door gap. Its better than the LH side as then I removed the door ( bad move) However this time i left the door in situ and look, it fits great. I only made one error. A small one at that. I forgot to buy a jacking point when I purchased the sill from MGOC. Not so bad though as I can always weld it on later.



Next job is to repair the Inner wheel arch, replace whole of LH wing, but first make new repair section to rear window base. Its rusted completely through and no new panels are available.

I'm going to bend one at College on their ace bending machine. It comprises of a short vertical piece of say 8mm then the horizontal base with another bend tapering along its length down 90 degrees at say 8mm ( this is where the new wing will attach)

The job thats got to be done that looks a little fiddly is the hole in said window corner. Its a large radius in a 45 degree apex with little or no chance of getting in the scary grinder to dress the welds so I'm thinking I may braze a section in, if only I knew how to braze or had the kit !

I wisely did all this a few weeks before the easter hols, and guess what , ever since its been either snowing, raining, gale force winds or all three so I,m not so frustrated.

The earthquake also put a stop to things for a while.

After hearing what sounded like a dumper truck depositing 3 tons of bricks on the roof and a quick check that we were all ok, a rece showed the chimney stack had reduced in size and came to rest in the conservatory via the tri-ply roof. So my office has been out of bounds for some time till its replaced, the chimney stack has been repaired so we are not living in fear of errant bricks or slates anymore. When the weather is better and money abundant the car bodywork will be virtually done bar a few minor touch ups and cosmetics, then on to the suspension, or engine, or chrome, or carbs.............and on and on.